Nisqually River
4 water rights in Pierce County, Washington, with priority dates from July 26, 1956 to January 21, 1987.
Listed in priority order. When Nisqually River runs short, the rights near the top of this list are filled first and the ones at the bottom are the first asked to stop. Rights on the same stream in a neighbouring county, or on connected groundwater, can sit in the same line; the state's water commissioner or district office has the full picture. Sources are matched by name within the county, so two different streams with the same name would share this page.
Priority date · senior to junior
- Before 1880
- 1880–1899
- 1900–1919
- 1920–1949
- 1950–1972
- 1973–1999
- 2000 and later
- No priority date
- #1Jul 26, 1956Certificate S2-*13990CWRISNisqually River · Irrigation0.6 cfs, 120 AF
- #2Aug 15, 1978Certificate S2-24996GWRISNisqually River · Irrigation0.2 cfs, 28 AF
- #3Jan 16, 1987Certificate S2-27041CWRISNisqually River · Domestic single0.02 cfs, 1 AF
- #4Jan 21, 1987Certificate S2-27048CWRISNisqually River · Domestic single0.02 cfs, 1 AF