Leland Lake
5 water rights in Jefferson County, Washington, with priority dates from May 14, 1946 to January 24, 1985.
Listed in priority order. When Leland Lake runs short, the rights near the top of this list are filled first and the ones at the bottom are the first asked to stop. Rights on the same stream in a neighbouring county, or on connected groundwater, can sit in the same line; the state's water commissioner or district office has the full picture. Sources are matched by name within the county, so two different streams with the same name would share this page.
Priority date · senior to junior
- Before 1880
- 1880–1899
- 1900–1919
- 1920–1949
- 1950–1972
- 1973–1999
- 2000 and later
- No priority date
- #1May 14, 1946Certificate S2-*07123CWRISLeland Lake · Irrigation0.21 cfs
- #2Aug 12, 1963Certificate S2-*18061CWRISLeland Lake · Irrigation0.24 cfs, 48 AF
- #3Apr 26, 1974Certificate S2-22290CWRISLeland Lake · Domestic multiple0.01 cfs, 0.25 AF
- #4Sep 19, 1981Certificate S2-25989CWRISLeland Lake · Domestic single0.02 cfs, 1 AF
- #5Jan 24, 1985Certificate S2-26647CWRISLeland Lake · Domestic single0.02 cfs, 1 AF