Knife River
18 water rights in Dunn County, North Dakota, with priority dates from August 18, 1926 to June 18, 2026.
Listed in priority order. When Knife River runs short, the rights near the top of this list are filled first and the ones at the bottom are the first asked to stop. Rights on the same stream in a neighbouring county, or on connected groundwater, can sit in the same line; the state's water commissioner or district office has the full picture. Sources are matched by name within the county, so two different streams with the same name would share this page.
Priority date · senior to junior
- Before 1880
- 1880–1899
- 1900–1919
- 1920–1949
- 1950–1972
- 1973–1999
- 2000 and later
- No priority date
- #1Aug 18, 1926Water permit 167Knife River · Irrigation314 gpm, 79.5 AF
- #2Nov 15, 1949Water permit 323Knife River · Irrigation538.4 gpm, 95 AF
- #3Mar 9, 1966Water permit 1356Knife River · Irrigation137 AF
- #4Oct 15, 1968Water permit 1603Knife River · Irrigation5,850 gpm, 111 AF
- #5Feb 5, 1969Water permit 1622Knife River · Irrigation625 gpm, 54 AF
- #6Feb 1, 1973Water permit 1907Knife River · Irrigation6,000 gpm, 137.7 AF
- #7Aug 28, 1973Water permit 1967Knife River · Irrigation5,850 gpm, 118 AF
- #8Jun 4, 1975Water permit 2284Knife River · Irrigation1,153.8 gpm, 12 AF
- #9Jun 4, 1975Water permit 2284AKnife River · Irrigation1,539 gpm, 16 AF
- #10Mar 8, 2021Water permit 7160Knife River · Industrial200 gpm, 5.16 AF
- #11Mar 8, 2021Water permit 7162Knife River · Industrial200 gpm, 5.16 AF
- #12Mar 8, 2021Water permit 7163Knife River · Industrial200 gpm, 5.16 AF
- #13Mar 8, 2021Water permit 7170Knife River · Industrial200 gpm, 5.16 AF
- #14Oct 6, 2025Water permit 7436Knife River · Industrial1,500 gpm, 193 AF
- #15Jan 16, 2026Water permit 7455Knife River · Industrial1,500 gpm, 400 AF
- #16Mar 27, 2026Water permit 7471Knife River · Industrial1,500 gpm, 193 AF
- #17Apr 1, 2026Water permit 7473Knife River · Industrial1,500 gpm, 193 AF
- #18Jun 18, 2026Water permit 7457Knife River · Industrial2,000 gpm, 800 AF