Water right 22-7505
Irrigation · Teton River · Teton County, Idaho
Priority date
July 1, 1985
42nd most senior of 43 rights on Teton River in Teton County
- Owner
- Teton Pipeline Assn INC
- Status
- Active
- Record type
- Decreed
- Source
- Teton River
- Kind of source
- Surface water
- Tributary of
- Henrys Fork
- Name
- Boehlke Pump
- Uses
- Irrigation
- Flow rate
- 6.3 cfs (2,827.6 gpm)
- Volume
- 1,102.5 acre-feet
- County
- Teton County
- Points of diversion
- 5 (first at 43.86444, -111.25314)
- Water district
- 01
- Documents
- Open
See every right within a mile of this one
Its place on Teton River
Rights just ahead of and behind it in priority on the same source.
- #38Jan 11, 198322-7419Teton River · IrrigationScheid, Karen K · 0.12 cfs, 17.5 AF
- #39Nov 12, 198422-7482Teton River · PowerFall River Rural Electric Cooperative INC · 80 cfs
- #40Feb 25, 198522-7487Teton River · PowerFall River Rural Electric Cooperative INC · 180 cfs
- #41Apr 1, 198522-13271Teton River · IrrigationTeton Pipeline Assn INC · 1.7 cfs
- #42 · this right
- #43Feb 2, 201822-14308Teton River · IrrigationKlb INC · 12.4 cfs, 5,260 AF
From Idaho Department of Water Resources, Water right points of diversion (active licensed and decreed rights), fetched October 12, 2026. The state's own record is the authority: amounts, owners and status here can lag behind it, and a mapped point of diversion says nothing about which parcel the right serves. This page is not legal advice.
How water rights work in Idaho · Report a problem with this record