Water right 22-7159
Irrigation · Teton River · Teton County, Idaho
Priority date
August 18, 1975
31st most senior of 43 rights on Teton River in Teton County
- Owner
- Teton Pipeline Assn INC
- Status
- Active
- Record type
- Decreed
- Source
- Teton River
- Kind of source
- Surface water
- Tributary of
- Henrys Fork
- Name
- Clementsville Pumps (3)
- Uses
- Irrigation
- Flow rate
- 1.9 cfs (852.8 gpm)
- Volume
- 285 acre-feet
- County
- Teton County
- Points of diversion
- 5 (first at 43.87394, -111.24786)
- Water district
- 01
- Documents
- Open
See every right within a mile of this one
Its place on Teton River
Rights just ahead of and behind it in priority on the same source.
- #27Dec 10, 197422-7119Teton River · IrrigationTeton Pipeline Assn INC · 6 cfs, 1,631 AF
- #28Dec 31, 197422-7122Teton River · IrrigationTeton Pipeline Assn INC · 12 cfs, 4,189.5 AF
- #29Jan 14, 197522-7121Teton River · IrrigationTeton Pipeline Assn INC · 8 cfs, 2,796.5 AF
- #30Jul 23, 197522-7148Teton River · IrrigationTeton Pipeline Assn INC · 7 cfs, 2,554.7 AF
- #31 · this right
- #32Apr 1, 197622-7180Teton River · IrrigationTeton Pipeline Assn INC · 12.06 cfs, 2,198 AF
- #33Apr 27, 197622-7186Teton River · IrrigationTeton Pipeline Assn INC · 11.16 cfs, 1,953 AF
- #34Sep 23, 197622-7196Teton River · IrrigationKlb INC · 1 cfs, 424.5 AF
- #35Mar 12, 198122-7349Teton River · IrrigationTeton Canyon Ranch LLC · 1.29 cfs, 512 AF
From Idaho Department of Water Resources, Water right points of diversion (active licensed and decreed rights), fetched October 12, 2026. The state's own record is the authority: amounts, owners and status here can lag behind it, and a mapped point of diversion says nothing about which parcel the right serves. This page is not legal advice.
How water rights work in Idaho · Report a problem with this record